Location
Nayarhat, Savar, Dhaka-1350,
Duration
180 Months (Approx.)
Start Date
12.06.2024
Completion Date
04/12/2024
Detailed Narrative Description of Project: Preparation of the Techno-Economic Feasibility Study (TEFS) for establishing a WPP Bag Factory with inner liner facilities by introducing energy-efficient and environment-friendly technology within the premises of Dhaka Leather Company Ltd., Nayarhat, Savar, Dhaka-1350, Bangladesh. Preparation of a detailed Master Plan for the project area, including topographic survey, landscaping, and architectural design for each component. Preparation of all architectural designs and drawings, including: Complete building plans and sections, 3D architectural views, Land survey and soil test (subsoil investigation), Engineering designs, including: Structural design, Plumbing and sanitary system design, WTP (Water Treatment Plant), and STP (Sewage Treatment Plant), Internal and external electrification. HVAC, and lift mechanical systems, Fire Detection, Protection Design & Drawing as per fire and safety defense regulatory rules. Preparation of BOQ (Bill of Quantities) and cost estimation following the PWD current rate schedule and prevailing market prices. Preparation of technical specifications and standard tender documents for all works. Project Estimated cost BDT. 925.01 crore.
Name of Senior Professional Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:
Engr. Arshad Amin : Team Leader
Arch. Sazzadur Rasheed : Architect
Arch. Syed Muhammad Abu Sayeed: Architect
Dr. Engr. Md. Shah Jahan : Civil Engineer
Engr. Md. Hamidul Haque Hazari : Civil Engineer
Engr. M.S. Mahmoodur Rahman Peng: Civil Engineer
Engr. A. F.M Muzammel Haque : Chemical Engineer
Engr. Md. Sultan Salahuddin : Chemical Engineer
Engr. Md. Nazmul Haider : Mechanical Engineer
Engr. Khandaker Mustafizur Rahman : Mechanical Engineer
Engr. Manzarey Khorshed Alam : Electrical Engineer
Engr. Monoranjan Kumar Roy : Electrical Engineer
Dr. Engr. Hafiz Abdur Rahman : Instrument Specialist
Engr. Md. Nizam Uddin Ahmed : Instrument Specialist
1. Dr. Md. Abu Syed : Environmental Specialist
Dr. Md. Mostafizur Rahman : Environmental Specialist
Engr. Md. Mahfuzur Rahman, PEng : HAZOP Analyst
Dr. Md. Maksudur Rahman Sarker : Document Analyst
Dr. Md. Shakhawat Hossain Chowdhury: Financial Management
Analyst
Dr. Muhammad Shahadat Hossain Siddiquee : Economist
Dr. Mohammad Bellal Hossain : Social Specialist
Dr. Ferdoush Saleheen : Procurement & Supply Chain
Specialist
Dr. Md. Abul Quasem Siddique : Transportation Expert
Dr. Afsana Haque : Urban Planning Expert
Dr. Engr. Minhaz M. Shahriar : Geo-Technical Expert
Dr. A. F. G. Masud Reza : Chemist
Mr. Md. Iftekharul Islam : Marketing Analyst
Mr. Mirazul Islam : Field Data Collector / Field
Surveyor
Mr. Al-Amin Jewel : Field Data Collector / Field
Surveyor
Engr. Md. Mukhlasur Rahman : Cost Estimator
Detailed Description of Actual Services Provided by our Staff:
Digital Land Survey
Sub-Soil investigation
Preparation of Conceptual Master Plan
Flood Inundation Study in Detail
Detailed traffic impact design
IEE/EIA/EMP report preparation as per DOEB Guidelines
Market demand analysis
All sorts of Architectural designs following the BNBC 2020
code guideline
All sorts of Structural designs following the BNBC 2020
code guideline
Detailed structural design with green concept
Solid waste management system
Rainwater Harvesting System Design
Playground design for schools/colleges, others.
Detailed design of sewerage, stormwater & solid waste
management system
Details of the security Access system design / BMS design
Design of internal & external water supply system
Surface water treatment plant design
Preparation of MEP, WTP & STP Design
Preparation of Fire Detection, Protection Design & Drawing
as per fire and safety defense regulatory rules
Financial Analysis
Economic Analysis
Making BOQ
Cost estimation following the PWD current rate schedule/
Market Prices
Preparation of standard tender documents
Preparation of technical specification
Preparation of DPP