Location
Shobhanbag, Mirpur Road, Dhaka-1207
Duration
22.5 Months (Approx.)
Start Date
February 2024
Completion Date
March 2024
Detailed Narrative Description of Project: Consultancy services for the “Strengthening of Bangladesh Institute of Management (BIM) Dhaka Project,” for preparation of master plan showing existing structural & proposed structural like main gate, children park, Boundary wall, internal R.C.C Road, R.C.C. surface train along with road & preparation as detail Architectural design & drawing including structural and MEP, WTP, STP, and landscaping along with preparation of BOQ, cost estimation, standard tender documents, technical specifications, and construction supervision.
Name of Senior Professional Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:
Dr. Engr. Md. Shah Jahan : Team Leader/ Project Manager
Arch. Abu Md. Fazlul Karim : Sr. Architect
Engr. Md. Ruhul Alam : Sr. Structural Engineer
Minhaz M. Shahriar : Civil/Foundation Engineer
Prof. Dr. Hafiz Abdur Rahman : Electrical Engineer
Engr. Benazir Chowdhury : Plumbing Engineer
Engr. Belal Ahmad : Mechanical Engineer
Engr. Md. Mukhlasur Rahman : Estimator
Prof. Dr. Shafi Mohammad Tareq, Ph.D: Environmental &
Social Impact Assessment Specialist
Prof. Dr. Md. Maksudur Rahman Sarker: Financial Analyst
Dr. Ferdoush Saleheen : Procurement and Supply Chain
Specialist
Md. Azizul Islam : CAD Operator-Sr.
Ms. Rameza Akter : CAD Operator-Jr.
Engr. Shalay Akram : Field / Site Supervisor
Engr. Md. Amir Hamza : Field / Site Supervisor
Detailed Description of Actual Services Provided by our Staff:
Pre-design Phase
• Site analysis
• Land Survey (Topographic surveys)
• Sub-soil investigation
• Preparation of a conceptual architectural master Plan
showing the proposed Structure
• Approval of the conceptual master plan
Design Phase
• Preparation of all Sorts of Architectural Designs &
Drawings as per the TOR
• Preparation of structural (Both Foundation &
Super-Structure), following the BNBC 2020 code guideline
• Preparation of MEP Design & Drawings following the BNBC
2020 code guideline
• Preparation of Fire Detection & Protection Design &
Drawing as per fire & safety defense regulatory rules
• Preparation of Interior Design & Drawings as per TOR
• Land Scape & Site Development
• Preparation of BOQ & Cost Estimation
• Preparation of Cost estimation following the PWD current
rate schedule/ Market Prices
• Preparation of standard technical specification
• Preparation of standard tender document
Supervision Phase
• To assist the client with contract administration &
management.
• Site Supervision and quality control
• Progress & monitoring reporting
• Technical oversight of work
• To maintain the standard Health, Safety & Environmental
issues of the project
• Project closeout and handover